Sangu (Sorun) Khola Hydropower Project is a 5.0 MW run-of-the-river scheme located in Dolakha District. The project generates 29.72 GWh of clean energy annually, utilizing a design discharge of 1.88 m³/s with a net head of 316.86 m.
Sangu Sorun Khola Hydroelectric Project (5MW)
Sangu (Sorun) Khola Hydropower Project is a 5.0 MW run-of-the-river scheme located in Dolakha District. The project generates 29.72 GWh of clean energy annually, utilizing a design discharge of 1.88 m³/s with a net head of 316.86 m.
Sangu(Sorun) Khola Hydroelectric Project ( 5 MW)
Sangu (Sorun) Khola Hydropower Project is a 5.0 MW run-of-the-river scheme located in Dolakha District. The project generates 29.72 GWh of clean energy annually, utilizing a design discharge of 1.88 m³/s with a net head of 316.86 m.
Who We Are
The company’s core business is Hydropower development managing comprehensive management of study to carry out feasibility study to determine the technical feasibility and financial viability of the Hydropower Project, which will beinterconnected with the Integrated Nepal Power System (INPS). The study report can be used as a basis for concluding Power Purchase Agreement (PPA) with Nepal Electricity Authority (NEA), for obtaining the generation license from DOED and for funding arrangement of the project. The main tasks carried out during the field investigations are topographical survey and mapping of project area,surface geological mapping and hydrological survey. The main outcome of the study incorporates the general arrangement of project structures including feasibility level design and drawings and power and energy computation from the project.